Optimize IT Change Management
Right-size IT change management to protect the live environment.
The Situation
- Infrastructure managers and change managers need to re-evaluate their change management processes due to slow change turnaround time, too many unauthorized changes, too many incidents and outages because of poorly managed changes, or difficulty evaluating and prioritizing changes.
- IT system owners often resist change management because they see it as slow and bureaucratic.
- Infrastructure changes are often seen as different from application changes, and two (or more) processes may exist.
- Create a unified change management process that reduces risk. The process should be balanced in its approach toward deploying changes while also maintaining throughput of innovation and enhancements.
- Categorize changes based on an industry-standard risk model with objective measures of impact and likelihood.
- Establish and empower a change manager and change advisory board with the authority to manage, approve, and prioritize changes.
- Integrate a configuration management database with the change management process to identify dependencies.
Blueprint Contents
-
Optimize IT Change Management – Executive Brief
-
Optimize IT Change Management – Phases 1-4
-
Change Management Maturity Assessment Tool
-
Change Management Risk Assessment Tool
-
Change Manager
-
Change Management Process Library – Visio
-
Change Management Process Library – PDF
-
Change Management Standard Operating Procedure
-
Request for Change Form Template
-
Change Management Pre-Implementation Checklist
-
Change Management Post-Implementation Checklist
-
Change Management Metrics Tool
-
Change Management Communications Plan
-
Change Management Roadmap Tool
-
Optimize IT Change Management Improvement Initiative: Project Summary Template
Member Testimonials
After each Info-Tech experience, we ask our members to quantify the real-time savings, monetary impact, and project improvements our research helped them achieve. See our top member experiences for this blueprint and what our clients have to say.
9.7/10
Overall Impact
$55,264
Average $ Saved
33
Average Days Saved
| Client | ATC |
|---|---|
| Experience | Workshop |
| Impact | 9/10 |
| $ Saved | N/A |
| Days Saved | 20 |
| Testimonial |
Best part was that Sumit, our Info-Tech facilitator, had experience in the area of Change Management and was able to help walk us through workshop ...
Best part was that Sumit, our Info-Tech facilitator, had experience in the area of Change Management and was able to help walk us through workshop in a productive manner. He helped us get to common definitions and common practices.
There wasn't really a worst part other than everyone was very tired by the end of day. It is a lot of concentrated attention and thinking.
|
| Client | CenCal Health |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $2,720 |
| Days Saved | 10 |
| Testimonial |
| Client | Connor, Clark & Lunn Financial Group Ltd. |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $23,500 |
| Days Saved | 20 |
| Testimonial |
| Client | MAX Solutions |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $9,000 |
| Days Saved | 10 |
| Testimonial |
| Client | LION |
|---|---|
| Experience | Guided Implementation |
| Impact | 8/10 |
| $ Saved | $13,600 |
| Days Saved | 5 |
| Testimonial |
| Client | PA Public Utility Commission |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $68,000 |
| Days Saved | 20 |
| Testimonial |
NA
NA
|
| Client | Fayetteville State University |
|---|---|
| Experience | Workshop |
| Impact | 10/10 |
| $ Saved | $68,000 |
| Days Saved | 50 |
| Testimonial |
Workshop was well structured with tangibles things we could do immediately. In person would probably offered the FSU team a better experience to al...
Workshop was well structured with tangibles things we could do immediately. In person would probably offered the FSU team a better experience to allow for focusing.
|
| Client | Michigan State Court Administrative Office (SCAO) |
|---|---|
| Experience | Workshop |
| Impact | 10/10 |
| $ Saved | $68,500 |
| Days Saved | 26 |
| Testimonial |
The entire experience was wonderful. The overall value was higher because the workshop was intended to help us improve our recently established (~4...
The entire experience was wonderful. The overall value was higher because the workshop was intended to help us improve our recently established (~4 months ago) change enablement practice. Participants all had a good working understanding of change enablement, including roles, responsibilities, activities, etc. This allowed us to use the workshop to get better clarity in areas where we had gaps and focus on areas we felt would have the greatest value for improvements.
|
| Client | Sterilite Corporation |
|---|---|
| Experience | Workshop |
| Impact | 10/10 |
| $ Saved | $68,500 |
| Days Saved | 50 |
| Testimonial |
| Client | Hernando County Clerk of Circuit Court and Comptroller |
|---|---|
| Experience | Workshop |
| Impact | 9/10 |
| $ Saved | $26,030 |
| Days Saved | 23 |
| Testimonial |
Benedict was a great facilitator, very knowledgable, and kept my team engaged, which is no easy task!
Benedict was a great facilitator, very knowledgable, and kept my team engaged, which is no easy task!
|
| Client | Joseph Ribkoff Inc. |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $50,000 |
| Days Saved | 50 |
| Testimonial |
| Client | Gillette Children's Specialty Healthcare |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | N/A |
| Days Saved | 60 |
| Testimonial |
This was a great consultation and we have started the implementation.
This was a great consultation and we have started the implementation.
|
| Client | AgCountry Farm Credit Services |
|---|---|
| Experience | Workshop |
| Impact | 10/10 |
| $ Saved | $34,250 |
| Days Saved | 100 |
| Testimonial |
| Client | California Department of Real Estate |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $274K |
| Days Saved | 105 |
| Testimonial |
The best parts of my experience are the valuable advice, and thoughtful guidance form Frank that provided real world experiences that made our appr...
The best parts of my experience are the valuable advice, and thoughtful guidance form Frank that provided real world experiences that made our approach, and implementation a wonderful experience.
|
| Client | Platinum Equity Advisors LLC |
|---|---|
| Experience | Workshop |
| Impact | 8/10 |
| $ Saved | $64,999 |
| Days Saved | 20 |
| Testimonial |
A great workshop in its design. Where the sessions fall short is in application. This is of no fault of ITRG, but rather to our lack of maturity to...
A great workshop in its design. Where the sessions fall short is in application. This is of no fault of ITRG, but rather to our lack of maturity to apply to.
The lessons learned from the sessions will be invaluable once we are ready to apply.
|
| Client | Georgia Municipal Association |
|---|---|
| Experience | Workshop |
| Impact | 10/10 |
| $ Saved | N/A |
| Days Saved | 5 |
| Testimonial |
I really enjoyed the workshop and the dialog it prompted from my team. I wish that it could have been facilitated in person, as the dynamics were a...
I really enjoyed the workshop and the dialog it prompted from my team. I wish that it could have been facilitated in person, as the dynamics were a bit off due to the technical delays. And there is value in the dialog before and after formal workshop time and during lunch that the facilitator misses when not in person.
|
| Client | Arkansas Department of Transportation |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $2,599 |
| Days Saved | 20 |
| Testimonial |
Flexibility and knowledge.
Flexibility and knowledge.
|
| Client | Alliance Resource Partners |
|---|---|
| Experience | Workshop |
| Impact | 10/10 |
| $ Saved | N/A |
| Days Saved | 5 |
| Testimonial |
| Client | Utah Valley University |
|---|---|
| Experience | Guided Implementation |
| Impact | 9/10 |
| $ Saved | $32,499 |
| Days Saved | 2 |
| Testimonial |
John's audio seemed to go in and out and become garbled at times. We were always able to follow his train of discussion, but it was difficult at ti...
John's audio seemed to go in and out and become garbled at times. We were always able to follow his train of discussion, but it was difficult at times to hear every word. Kind of sounded like a bandwidth issue.
|
| Client | Mainstream Renewable Power Ltd |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $11,839 |
| Days Saved | 10 |
| Testimonial |
The best was Mahmoud dedication to this and the fact that he is realistic in his assessments. Also, he is very friendly and professional at the sa...
The best was Mahmoud dedication to this and the fact that he is realistic in his assessments. Also, he is very friendly and professional at the same time which is great.
|
| Client | Space Telescope Science Institute |
|---|---|
| Experience | Guided Implementation |
| Impact | 9/10 |
| $ Saved | N/A |
| Days Saved | 5 |
| Testimonial |
Good engagement, knowledgeable consultant - receptive to my views - on this basis, I will do more....
Good engagement, knowledgeable consultant - receptive to my views - on this basis, I will do more....
|
| Client | Kentucky Fried Chicken UK |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $82,000 |
| Days Saved | 50 |
| Testimonial |
We are still talking to Ben on our journey to introduce change control but we are learning. His knowledge is exfellent & I truely believe once we ...
We are still talking to Ben on our journey to introduce change control but we are learning. His knowledge is exfellent & I truely believe once we are fully up & running the benefits will be great.
|
| Client | 4Wall Entertainment |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $13,700 |
| Days Saved | 20 |
| Testimonial |
| Client | New-Indy Containerboard, LLC |
|---|---|
| Experience | Guided Implementation |
| Impact | 9/10 |
| $ Saved | $12,599 |
| Days Saved | 10 |
| Testimonial |
| Client | Synergi Partners |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $77,999 |
| Days Saved | 47 |
| Testimonial |
| Client | Saskatchewan Blue Cross |
|---|---|
| Experience | Workshop |
| Impact | 9/10 |
| $ Saved | $30,000 |
| Days Saved | 10 |
| Testimonial |
Best: we came out with a very practical framework for change management that was right-sized for our organization
Worst: On our end from time to...
Best: we came out with a very practical framework for change management that was right-sized for our organization
Worst: On our end from time to time we had to be in and out of the session and Sumit would need to try to catch up whomever was missing. This catch up did take a lot of time and could have been at a higher level to allow the workshop to continue progressing at a good pace.
|
| Client | 4Wall Entertainment |
|---|---|
| Experience | Workshop |
| Impact | 10/10 |
| $ Saved | $31,499 |
| Days Saved | 10 |
| Testimonial |
Overall experience was great, a huge benefit to the entire IT team. Benedict Chang's mastery of the material and process was evident as we compress...
Overall experience was great, a huge benefit to the entire IT team. Benedict Chang's mastery of the material and process was evident as we compressed the difficult objective of a formal change management program into a one-week sprint. The result includes clearly defined deliverables and a well-planned program that we can follow and implement immediately to add high value to the business. Once again, Info-Tech has proven its value by providing an excellent workshop. You have a great team!
|
| Client | Government of Saskatchewan-Ministry of SaskBuilds and Procurement- Information Technology Division |
|---|---|
| Experience | Guided Implementation |
| Impact | 9/10 |
| $ Saved | $16,000 |
| Days Saved | 20 |
| Testimonial |
| Client | Heniff Transportation Systems |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $12,399 |
| Days Saved | 10 |
| Testimonial |
Best was affirmation of what process I have been using aligns with best practice, nothing negative at this time.
Best was affirmation of what process I have been using aligns with best practice, nothing negative at this time.
|
| Client | Department of Justice Canada |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | N/A |
| Days Saved | N/A |
| Testimonial |
Ben was extremely knowledgeable, articulate, and succinct, able to move through much useful information very quickly without appearing rushed. I lo...
Ben was extremely knowledgeable, articulate, and succinct, able to move through much useful information very quickly without appearing rushed. I look forward to a follow up at a later date. Thank you.
|
| Client | Experience | Impact | $ Saved | Days Saved | Testimonial |
|---|---|---|---|---|---|
| ATC | Workshop | 9/10 | N/A | 20 |
Best part was that Sumit, our Info-Tech facilitator, had experience in the area of Change Management and was able to help walk us through workshop ...
Best part was that Sumit, our Info-Tech facilitator, had experience in the area of Change Management and was able to help walk us through workshop in a productive manner. He helped us get to common definitions and common practices.
There wasn't really a worst part other than everyone was very tired by the end of day. It is a lot of concentrated attention and thinking.
|
| CenCal Health | Guided Implementation | 10/10 | $2,720 | 10 | |
| Connor, Clark & Lunn Financial Group Ltd. | Guided Implementation | 10/10 | $23,500 | 20 | |
| MAX Solutions | Guided Implementation | 10/10 | $9,000 | 10 | |
| LION | Guided Implementation | 8/10 | $13,600 | 5 | |
| PA Public Utility Commission | Guided Implementation | 10/10 | $68,000 | 20 |
NA
NA
|
| Fayetteville State University | Workshop | 10/10 | $68,000 | 50 |
Workshop was well structured with tangibles things we could do immediately. In person would probably offered the FSU team a better experience to al...
Workshop was well structured with tangibles things we could do immediately. In person would probably offered the FSU team a better experience to allow for focusing.
|
| Michigan State Court Administrative Office (SCAO) | Workshop | 10/10 | $68,500 | 26 |
The entire experience was wonderful. The overall value was higher because the workshop was intended to help us improve our recently established (~4...
The entire experience was wonderful. The overall value was higher because the workshop was intended to help us improve our recently established (~4 months ago) change enablement practice. Participants all had a good working understanding of change enablement, including roles, responsibilities, activities, etc. This allowed us to use the workshop to get better clarity in areas where we had gaps and focus on areas we felt would have the greatest value for improvements.
|
| Sterilite Corporation | Workshop | 10/10 | $68,500 | 50 | |
| Hernando County Clerk of Circuit Court and Comptroller | Workshop | 9/10 | $26,030 | 23 |
Benedict was a great facilitator, very knowledgable, and kept my team engaged, which is no easy task!
Benedict was a great facilitator, very knowledgable, and kept my team engaged, which is no easy task!
|
| Joseph Ribkoff Inc. | Guided Implementation | 10/10 | $50,000 | 50 | |
| Gillette Children's Specialty Healthcare | Guided Implementation | 10/10 | N/A | 60 |
This was a great consultation and we have started the implementation.
This was a great consultation and we have started the implementation.
|
| AgCountry Farm Credit Services | Workshop | 10/10 | $34,250 | 100 | |
| California Department of Real Estate | Guided Implementation | 10/10 | $274K | 105 |
The best parts of my experience are the valuable advice, and thoughtful guidance form Frank that provided real world experiences that made our appr...
The best parts of my experience are the valuable advice, and thoughtful guidance form Frank that provided real world experiences that made our approach, and implementation a wonderful experience.
|
| Platinum Equity Advisors LLC | Workshop | 8/10 | $64,999 | 20 |
A great workshop in its design. Where the sessions fall short is in application. This is of no fault of ITRG, but rather to our lack of maturity to...
A great workshop in its design. Where the sessions fall short is in application. This is of no fault of ITRG, but rather to our lack of maturity to apply to.
The lessons learned from the sessions will be invaluable once we are ready to apply.
|
| Georgia Municipal Association | Workshop | 10/10 | N/A | 5 |
I really enjoyed the workshop and the dialog it prompted from my team. I wish that it could have been facilitated in person, as the dynamics were a...
I really enjoyed the workshop and the dialog it prompted from my team. I wish that it could have been facilitated in person, as the dynamics were a bit off due to the technical delays. And there is value in the dialog before and after formal workshop time and during lunch that the facilitator misses when not in person.
|
| Arkansas Department of Transportation | Guided Implementation | 10/10 | $2,599 | 20 |
Flexibility and knowledge.
Flexibility and knowledge.
|
| Alliance Resource Partners | Workshop | 10/10 | N/A | 5 | |
| Utah Valley University | Guided Implementation | 9/10 | $32,499 | 2 |
John's audio seemed to go in and out and become garbled at times. We were always able to follow his train of discussion, but it was difficult at ti...
John's audio seemed to go in and out and become garbled at times. We were always able to follow his train of discussion, but it was difficult at times to hear every word. Kind of sounded like a bandwidth issue.
|
| Mainstream Renewable Power Ltd | Guided Implementation | 10/10 | $11,839 | 10 |
The best was Mahmoud dedication to this and the fact that he is realistic in his assessments. Also, he is very friendly and professional at the sa...
The best was Mahmoud dedication to this and the fact that he is realistic in his assessments. Also, he is very friendly and professional at the same time which is great.
|
| Space Telescope Science Institute | Guided Implementation | 9/10 | N/A | 5 |
Good engagement, knowledgeable consultant - receptive to my views - on this basis, I will do more....
Good engagement, knowledgeable consultant - receptive to my views - on this basis, I will do more....
|
| Kentucky Fried Chicken UK | Guided Implementation | 10/10 | $82,000 | 50 |
We are still talking to Ben on our journey to introduce change control but we are learning. His knowledge is exfellent & I truely believe once we ...
We are still talking to Ben on our journey to introduce change control but we are learning. His knowledge is exfellent & I truely believe once we are fully up & running the benefits will be great.
|
| 4Wall Entertainment | Guided Implementation | 10/10 | $13,700 | 20 | |
| New-Indy Containerboard, LLC | Guided Implementation | 9/10 | $12,599 | 10 | |
| Synergi Partners | Guided Implementation | 10/10 | $77,999 | 47 | |
| Saskatchewan Blue Cross | Workshop | 9/10 | $30,000 | 10 |
Best: we came out with a very practical framework for change management that was right-sized for our organization
Worst: On our end from time to...
Best: we came out with a very practical framework for change management that was right-sized for our organization
Worst: On our end from time to time we had to be in and out of the session and Sumit would need to try to catch up whomever was missing. This catch up did take a lot of time and could have been at a higher level to allow the workshop to continue progressing at a good pace.
|
| 4Wall Entertainment | Workshop | 10/10 | $31,499 | 10 |
Overall experience was great, a huge benefit to the entire IT team. Benedict Chang's mastery of the material and process was evident as we compress...
Overall experience was great, a huge benefit to the entire IT team. Benedict Chang's mastery of the material and process was evident as we compressed the difficult objective of a formal change management program into a one-week sprint. The result includes clearly defined deliverables and a well-planned program that we can follow and implement immediately to add high value to the business. Once again, Info-Tech has proven its value by providing an excellent workshop. You have a great team!
|
| Government of Saskatchewan-Ministry of SaskBuilds and Procurement- Information Technology Division | Guided Implementation | 9/10 | $16,000 | 20 | |
| Heniff Transportation Systems | Guided Implementation | 10/10 | $12,399 | 10 |
Best was affirmation of what process I have been using aligns with best practice, nothing negative at this time.
Best was affirmation of what process I have been using aligns with best practice, nothing negative at this time.
|
| Department of Justice Canada | Guided Implementation | 10/10 | N/A | N/A |
Ben was extremely knowledgeable, articulate, and succinct, able to move through much useful information very quickly without appearing rushed. I lo...
Ben was extremely knowledgeable, articulate, and succinct, able to move through much useful information very quickly without appearing rushed. I look forward to a follow up at a later date. Thank you.
|
ITRG Provides Proven Results for IT Leaders
30,000+
ITRG members spanning the Global 2000
$400M+
Cut from IT costs with our pricing intelligence and advisory support
+8%
Increase in stakeholder satisfaction where IT leaders used Info-Tech services
9.5/10
Member-related value across +50,000 analyst calls, workshops and projects
About Info-Tech Research Group
Info-Tech Research Group is the world’s fastest-growing information technology research and advisory company, proudly serving over 30,000 IT professionals.
We produce unbiased and highly relevant research to help CIOs and IT leaders make strategic, timely, and well-informed decisions. We partner closely with IT teams to provide everything they need, from actionable tools to analyst guidance, ensuring they deliver measurable results for their organizations.
Our Offices
Arlington, VA
1225 South Clark Street, Suite 1310
Arlington, VA, USA
22202
Las Vegas, NV
3960 Howard Hughes Parkway, Suite 500
Las Vegas, NV, USA
89169
London, ON
345 Ridout Street North
London, ON, Canada
N6A 2N8
London, UK
10 York Road, Suite 5W127
London, United Kingdom
SE1 7ND
Singapore
71 Robinson Road, #14-130
Singapore
068895
Sydney, NSW
320 Pitt Street, Level 6
Sydney, NSW, Australia
2000
Toronto, ON
888 Yonge Street
Toronto, ON, Canada
M4W 2J2