Develop a Project Portfolio Management Strategy
Drive IT project throughput by throttling resource capacity.
The Situation
- As an IT leader, you oversee a project environment in which the organizational demand for new products, services, and enhancements far outweighs IT’s resource capacity to adequately deliver on everything.
- As a result, project throughput suffers. IT starts a lot of projects, but has constant difficulties delivering the bulk of them on time, on budget, in scope, and of high quality. What’s more, many of the projects that consume IT’s time are of questionable value to the business.
- You need a project portfolio management (PPM) strategy to help bring order to IT’s project activity. With the right PPM strategy, you can ensure that you’re driving the throughput of the best projects and maximizing stakeholder satisfaction with IT.
- Manage the portfolio as more than just the sum of its parts. Create a coherent strategy to maximize the sum of values that projects deliver as a whole – as a project portfolio, rather than a collection of individual projects.
- Get to value early. Info-Tech’s methodology tackles one of PPM’s most pressing challenges upfront by helping you to articulate a strategy and get executive buy-in for it before you define your process goals. When senior management understands why a PPM strategy is necessary and of value to them, the path to implementation is much more stable.
- Create PPM processes you can sustain. Translate your PPM strategy into specific, tangible near-term and long-term goals, which are realized through a suite of project portfolio management processes tailored to your organization and its culture.
Blueprint Contents
-
Develop a Project Portfolio Management Strategy – Executive Brief
-
Develop a Project Portfolio Management Strategy – Phases 1-3
-
Develop a Project Portfolio Management Strategy – Phase 1: Get Executive Buy-In for Your PPM Strategy
-
PPM High-Level Supply-Demand Calculator
-
PPM Strategic Plan Template
-
PPM Strategy-Process Goals Translation Matrix Template
-
Develop a Project Portfolio Management Strategy – Phase 2: Align PPM Processes to Your Strategic Goals
-
PPM Strategy Development Tool
-
Develop a Project Portfolio Management Strategy – Phase 3: Complete Your PPM Strategic Plan
-
Project Portfolio Analyst / PMO Analyst
Member Testimonials
After each Info-Tech experience, we ask our members to quantify the real-time savings, monetary impact, and project improvements our research helped them achieve. See our top member experiences for this blueprint and what our clients have to say.
9.6/10
Overall Impact
$71,499
Average $ Saved
33
Average Days Saved
| Client | Toronto Community Housing Corporation |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $11,500 |
| Days Saved | 10 |
| Testimonial |
Quick and easy demo. Great knowledgeable Analyst. Long was very thorough and helpful.
Quick and easy demo. Great knowledgeable Analyst. Long was very thorough and helpful.
|
| Client | City of Tucson Information Technology Department Office of the Deputy Director |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | N/A |
| Days Saved | 50 |
| Testimonial |
Long is excellent at explaining the use of the tools but of even greater value to me has been his help in understanding the discipline overall, the...
Long is excellent at explaining the use of the tools but of even greater value to me has been his help in understanding the discipline overall, the purpose behind the tools, and explaining how the component parts all fit together.
|
| Client | Maricopa County Office of Enterprise Technology |
|---|---|
| Experience | Workshop |
| Impact | 10/10 |
| $ Saved | N/A |
| Days Saved | N/A |
| Testimonial |
Not sure how to equate productivity, efficiency, or cost savings based on this workshop. However, the information is valuable to assist us with ou...
Not sure how to equate productivity, efficiency, or cost savings based on this workshop. However, the information is valuable to assist us with our continuous improvement in this space. Discussion was informative and the knowledge that Sumit provided was superb. I would definitely recommend to others and would consider workshops in other areas in the future.
|
| Client | York Regional Police |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $14,500 |
| Days Saved | 5 |
| Testimonial |
| Client | City Of Brampton |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $47,500 |
| Days Saved | 41 |
| Testimonial |
Excellent experience. The regular cadence of these sessions with Matt keeps me on track to reach my organizational goals. The courses, research i...
Excellent experience. The regular cadence of these sessions with Matt keeps me on track to reach my organizational goals. The courses, research information and practical materials are a value add to my experience. Matt is a pleasure to work with, is responsive to my needs and an excellent person to work with. Thank you, Matt!
|
| Client | United Nations Office at Vienna (UNOV) |
|---|---|
| Experience | Workshop |
| Impact | 9/10 |
| $ Saved | N/A |
| Days Saved | N/A |
| Testimonial |
The facilitator was awesome, I just wish we could have had an in-person workshop. P.S. it's hard to rate the financial impact as this is an ongoing...
The facilitator was awesome, I just wish we could have had an in-person workshop. P.S. it's hard to rate the financial impact as this is an ongoing activity.
|
| Client | Nebco, Inc |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | N/A |
| Days Saved | 5 |
| Testimonial |
Elvis provided outstanding experience in the start up of a PMO for a mid-sized business.
Elvis provided outstanding experience in the start up of a PMO for a mid-sized business.
|
| Client | Vancouver Foundation |
|---|---|
| Experience | Guided Implementation |
| Impact | 9/10 |
| $ Saved | $10,000 |
| Days Saved | 10 |
| Testimonial |
The analyst on the call was highly knowledgeable in PPM and Portfolio management. Long Dam shared some valuable insights into how to right-size th...
The analyst on the call was highly knowledgeable in PPM and Portfolio management. Long Dam shared some valuable insights into how to right-size the PPM strategy for Vancouver Foundation given the size and context of the organization. After the call we were able to better align on the role of the PMO at Vancouver Foundation including the key services were are looking to provide across the organization.
|
| Client | Reliance Standard Life Insurance Company |
|---|---|
| Experience | Guided Implementation |
| Impact | 8/10 |
| $ Saved | N/A |
| Days Saved | N/A |
| Testimonial |
Elvis was very engaged and provided nice guidance to help building IT PMO strategy that's suited for my organization. Appreciate his flexibility an...
Elvis was very engaged and provided nice guidance to help building IT PMO strategy that's suited for my organization. Appreciate his flexibility and adaptiveness during the process. Thank you.
|
| Client | St. Lukes Health System Ltd. |
|---|---|
| Experience | Workshop |
| Impact | 10/10 |
| $ Saved | $34,000 |
| Days Saved | 20 |
| Testimonial |
Our Facilitator Bill Holiday was the best. He did a fantastic job relating the workshop objectives back to our business.
Our Facilitator Bill Holiday was the best. He did a fantastic job relating the workshop objectives back to our business.
|
| Client | Tyler Technologies, Inc. |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $13,600 |
| Days Saved | 20 |
| Testimonial |
This initiative is put on hold, but only because as a client I was not able to dedicate the time that Elvis needed to make this a success. His resp...
This initiative is put on hold, but only because as a client I was not able to dedicate the time that Elvis needed to make this a success. His response, guidance, feedback, and coaching are top-shelf and he's always prepared and hosts valuable and relevant conversations. I'm looking forward to when we can reengage, as I've worked through a similar initiative with Elvis and the outcomes are valuable.
|
| Client | Community Services Group, Inc. |
|---|---|
| Experience | Guided Implementation |
| Impact | 9/10 |
| $ Saved | N/A |
| Days Saved | N/A |
| Testimonial |
Long and Jason were able to guide us on our new path to get a PPM and project management strategy into place. With the tools provided, we will be a...
Long and Jason were able to guide us on our new path to get a PPM and project management strategy into place. With the tools provided, we will be able to begin coordinating our strategy and areas to focus that would provide the most benefit to the department and organization.
|
| Client | Oregon Secretary of State |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $13,600 |
| Days Saved | 60 |
| Testimonial |
The challenge I am having is knowing where to look for information. Long was very effective in showing me where to go for the information I needed....
The challenge I am having is knowing where to look for information. Long was very effective in showing me where to go for the information I needed. That saves valuable time knowing where to look. And being able to leverage the tools Long showed so that I can get management and team buy-in, again is invaluable.
|
| Client | City of Wilmington |
|---|---|
| Experience | Guided Implementation |
| Impact | 9/10 |
| $ Saved | $10,880 |
| Days Saved | 7 |
| Testimonial |
Best Part = Long is affirming our buildout and project management concepts for our leadership team. He is a refreshing voice to the importance of M...
Best Part = Long is affirming our buildout and project management concepts for our leadership team. He is a refreshing voice to the importance of Milestones, Criteria, Intake, Timelines, Portfolio Rollups
Worst parts = alot of advice as far as what to do next to ensure our PPM success, is not applicable to our current work culture, but Long does a great job at giving hints of what we can do when we do not have the buy in needed to do a successful PPM process, ie: stop moving forward with it
|
| Client | LSU AgCenter |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | N/A |
| Days Saved | 20 |
| Testimonial |
Best part:
The Info-Tech staff have been professional, courteous, well organized and knowledgeable.
Worst part:
There is A LOT of information...
Best part:
The Info-Tech staff have been professional, courteous, well organized and knowledgeable.
Worst part:
There is A LOT of information and resources available. It's a bit like drinking from a firehose, but I'm confident the Info-Tech analyst will walk us through the resources and help us select the resources that are applicable to our needs.
|
| Client | State of North Dakota |
|---|---|
| Experience | Workshop |
| Impact | 9/10 |
| $ Saved | $34,000 |
| Days Saved | 5 |
| Testimonial |
Best parts of the experience was working with Bill and the guidance he brought to the discussion. It was reassuring to learn that we are moving in...
Best parts of the experience was working with Bill and the guidance he brought to the discussion. It was reassuring to learn that we are moving in the complete wrong direction and that by building out some missing pieces, our PPM process will be solid.
The worst part was that we were not able to have a larger audience for a longer period of time. It simply was not feasible, but we did have the right voices at the table on the right days.
|
| Client | Brooks Automation US, LLC |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $13,700 |
| Days Saved | 10 |
| Testimonial |
| Client | Haworth |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $137K |
| Days Saved | 80 |
| Testimonial |
Best: Matt is outstanding & patient in guiding us through the improvement and maturing process. We have picked up the pace and are starting to see ...
Best: Matt is outstanding & patient in guiding us through the improvement and maturing process. We have picked up the pace and are starting to see some real impact in this effort.
Worst: We are slow to implement changes... but picking up the pace.
|
| Client | California Employment Development Department |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $12,330 |
| Days Saved | 8 |
| Testimonial |
| Client | City of Allen, TX |
|---|---|
| Experience | Workshop |
| Impact | 10/10 |
| $ Saved | N/A |
| Days Saved | 32 |
| Testimonial |
We were able to easily adapt our thinking and processes and map those to the provided tools and discussion. That will make implementation of this ...
We were able to easily adapt our thinking and processes and map those to the provided tools and discussion. That will make implementation of this new PPM approach much more attainable.
|
| Client | Public Safety Canada |
|---|---|
| Experience | Workshop |
| Impact | 9/10 |
| $ Saved | $50,000 |
| Days Saved | 23 |
| Testimonial |
Best parts were that Bill is super knowledgeable, patient and overall, just a nice person. He was able to quickly adapt to our culture and underst...
Best parts were that Bill is super knowledgeable, patient and overall, just a nice person. He was able to quickly adapt to our culture and understood the pressures we are facing.
Worst part was not having some fairly easily available data ready to go. We could have spent time massaging that info to be used ahead of the workshop.
|
| Client | Ministry of Industry, Innovation, Science and Technology |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $34,250 |
| Days Saved | 50 |
| Testimonial |
The best part is the valuable interactions around the tools and templates. The tools and templates alone without the guidance and support would hav...
The best part is the valuable interactions around the tools and templates. The tools and templates alone without the guidance and support would have caused us to take longer to achieve our goals.
|
| Client | Oregon Military Department |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $13,700 |
| Days Saved | 10 |
| Testimonial |
The whole package was useful and the time that was spent working through it together made it easy to adapt to our business needs.
The whole package was useful and the time that was spent working through it together made it easy to adapt to our business needs.
|
| Client | Starkey Hearing Technologies |
|---|---|
| Experience | Workshop |
| Impact | 10/10 |
| $ Saved | $75,350 |
| Days Saved | 50 |
| Testimonial |
Bill is an exceptional facilitator and is a subject matter expert.
Bill is an exceptional facilitator and is a subject matter expert.
|
| Client | Community Living Toronto |
|---|---|
| Experience | Workshop |
| Impact | 9/10 |
| $ Saved | $23,500 |
| Days Saved | 60 |
| Testimonial |
The sessions were very engaging and the team loved being pulled into various discussions. Doug did a great job poking around and challenging the s...
The sessions were very engaging and the team loved being pulled into various discussions. Doug did a great job poking around and challenging the status quo and offered suggestions/considerations for future plannings.
The sessions are quite long, and I felt like the team was maxed out around 2:00pm in the afternoon, but I understand the limitations, and we can power through this.
|
| Client | State of Kansas Human Services |
|---|---|
| Experience | Workshop |
| Impact | 10/10 |
| $ Saved | $137K |
| Days Saved | 90 |
| Testimonial |
| Client | Kansas Department of Transportation |
|---|---|
| Experience | Workshop |
| Impact | 8/10 |
| $ Saved | $65,075 |
| Days Saved | 47 |
| Testimonial |
I really liked how Bill was able to get our executive staff engaged in the conversation. He did a great job of understanding our current state, an...
I really liked how Bill was able to get our executive staff engaged in the conversation. He did a great job of understanding our current state, and where we want/need to be.
Thinking back, we did a great job of looking at our end goal, but perhaps it would have been beneficial to spend more time defining our interim steps. Not just short/mid/long term goals, but something more like phases.
|
| Client | New York State Technology Enterprise Corporation |
|---|---|
| Experience | Workshop |
| Impact | 10/10 |
| $ Saved | $685K |
| Days Saved | 120 |
| Testimonial |
Best: interaction and facilitation that Bill so expertly provided, ability to lead the group through the discussion to draw out the specific and a...
Best: interaction and facilitation that Bill so expertly provided, ability to lead the group through the discussion to draw out the specific and appropriate workflows for our business, identifying drivers and goals that were based on the workflow processes and tools to implement, and the actionable items to complete the PPM, Bill provided the much-needed training and context for explaining a rather challenging topic for us.
Worst: Although Bill managed this seamlessly for us, the some of the InfoTech materials are more IT department focused that are not as relatable to our business.
|
| Client | Institute of Public Accountants |
|---|---|
| Experience | Guided Implementation |
| Impact | 9/10 |
| $ Saved | N/A |
| Days Saved | 2 |
| Testimonial |
Annabel is always extremely helpful she takes time to listen then helps work things through with me.
Annabel is always extremely helpful she takes time to listen then helps work things through with me.
|
| Client | Harris County |
|---|---|
| Experience | Workshop |
| Impact | 10/10 |
| $ Saved | N/A |
| Days Saved | N/A |
| Testimonial |
The workshop delivery, deliverables, participation and discussion.
The workshop delivery, deliverables, participation and discussion.
|
| Client | Experience | Impact | $ Saved | Days Saved | Testimonial |
|---|---|---|---|---|---|
| Toronto Community Housing Corporation | Guided Implementation | 10/10 | $11,500 | 10 |
Quick and easy demo. Great knowledgeable Analyst. Long was very thorough and helpful.
Quick and easy demo. Great knowledgeable Analyst. Long was very thorough and helpful.
|
| City of Tucson Information Technology Department Office of the Deputy Director | Guided Implementation | 10/10 | N/A | 50 |
Long is excellent at explaining the use of the tools but of even greater value to me has been his help in understanding the discipline overall, the...
Long is excellent at explaining the use of the tools but of even greater value to me has been his help in understanding the discipline overall, the purpose behind the tools, and explaining how the component parts all fit together.
|
| Maricopa County Office of Enterprise Technology | Workshop | 10/10 | N/A | N/A |
Not sure how to equate productivity, efficiency, or cost savings based on this workshop. However, the information is valuable to assist us with ou...
Not sure how to equate productivity, efficiency, or cost savings based on this workshop. However, the information is valuable to assist us with our continuous improvement in this space. Discussion was informative and the knowledge that Sumit provided was superb. I would definitely recommend to others and would consider workshops in other areas in the future.
|
| York Regional Police | Guided Implementation | 10/10 | $14,500 | 5 | |
| City Of Brampton | Guided Implementation | 10/10 | $47,500 | 41 |
Excellent experience. The regular cadence of these sessions with Matt keeps me on track to reach my organizational goals. The courses, research i...
Excellent experience. The regular cadence of these sessions with Matt keeps me on track to reach my organizational goals. The courses, research information and practical materials are a value add to my experience. Matt is a pleasure to work with, is responsive to my needs and an excellent person to work with. Thank you, Matt!
|
| United Nations Office at Vienna (UNOV) | Workshop | 9/10 | N/A | N/A |
The facilitator was awesome, I just wish we could have had an in-person workshop. P.S. it's hard to rate the financial impact as this is an ongoing...
The facilitator was awesome, I just wish we could have had an in-person workshop. P.S. it's hard to rate the financial impact as this is an ongoing activity.
|
| Nebco, Inc | Guided Implementation | 10/10 | N/A | 5 |
Elvis provided outstanding experience in the start up of a PMO for a mid-sized business.
Elvis provided outstanding experience in the start up of a PMO for a mid-sized business.
|
| Vancouver Foundation | Guided Implementation | 9/10 | $10,000 | 10 |
The analyst on the call was highly knowledgeable in PPM and Portfolio management. Long Dam shared some valuable insights into how to right-size th...
The analyst on the call was highly knowledgeable in PPM and Portfolio management. Long Dam shared some valuable insights into how to right-size the PPM strategy for Vancouver Foundation given the size and context of the organization. After the call we were able to better align on the role of the PMO at Vancouver Foundation including the key services were are looking to provide across the organization.
|
| Reliance Standard Life Insurance Company | Guided Implementation | 8/10 | N/A | N/A |
Elvis was very engaged and provided nice guidance to help building IT PMO strategy that's suited for my organization. Appreciate his flexibility an...
Elvis was very engaged and provided nice guidance to help building IT PMO strategy that's suited for my organization. Appreciate his flexibility and adaptiveness during the process. Thank you.
|
| St. Lukes Health System Ltd. | Workshop | 10/10 | $34,000 | 20 |
Our Facilitator Bill Holiday was the best. He did a fantastic job relating the workshop objectives back to our business.
Our Facilitator Bill Holiday was the best. He did a fantastic job relating the workshop objectives back to our business.
|
| Tyler Technologies, Inc. | Guided Implementation | 10/10 | $13,600 | 20 |
This initiative is put on hold, but only because as a client I was not able to dedicate the time that Elvis needed to make this a success. His resp...
This initiative is put on hold, but only because as a client I was not able to dedicate the time that Elvis needed to make this a success. His response, guidance, feedback, and coaching are top-shelf and he's always prepared and hosts valuable and relevant conversations. I'm looking forward to when we can reengage, as I've worked through a similar initiative with Elvis and the outcomes are valuable.
|
| Community Services Group, Inc. | Guided Implementation | 9/10 | N/A | N/A |
Long and Jason were able to guide us on our new path to get a PPM and project management strategy into place. With the tools provided, we will be a...
Long and Jason were able to guide us on our new path to get a PPM and project management strategy into place. With the tools provided, we will be able to begin coordinating our strategy and areas to focus that would provide the most benefit to the department and organization.
|
| Oregon Secretary of State | Guided Implementation | 10/10 | $13,600 | 60 |
The challenge I am having is knowing where to look for information. Long was very effective in showing me where to go for the information I needed....
The challenge I am having is knowing where to look for information. Long was very effective in showing me where to go for the information I needed. That saves valuable time knowing where to look. And being able to leverage the tools Long showed so that I can get management and team buy-in, again is invaluable.
|
| City of Wilmington | Guided Implementation | 9/10 | $10,880 | 7 |
Best Part = Long is affirming our buildout and project management concepts for our leadership team. He is a refreshing voice to the importance of M...
Best Part = Long is affirming our buildout and project management concepts for our leadership team. He is a refreshing voice to the importance of Milestones, Criteria, Intake, Timelines, Portfolio Rollups
Worst parts = alot of advice as far as what to do next to ensure our PPM success, is not applicable to our current work culture, but Long does a great job at giving hints of what we can do when we do not have the buy in needed to do a successful PPM process, ie: stop moving forward with it
|
| LSU AgCenter | Guided Implementation | 10/10 | N/A | 20 |
Best part:
The Info-Tech staff have been professional, courteous, well organized and knowledgeable.
Worst part:
There is A LOT of information...
Best part:
The Info-Tech staff have been professional, courteous, well organized and knowledgeable.
Worst part:
There is A LOT of information and resources available. It's a bit like drinking from a firehose, but I'm confident the Info-Tech analyst will walk us through the resources and help us select the resources that are applicable to our needs.
|
| State of North Dakota | Workshop | 9/10 | $34,000 | 5 |
Best parts of the experience was working with Bill and the guidance he brought to the discussion. It was reassuring to learn that we are moving in...
Best parts of the experience was working with Bill and the guidance he brought to the discussion. It was reassuring to learn that we are moving in the complete wrong direction and that by building out some missing pieces, our PPM process will be solid.
The worst part was that we were not able to have a larger audience for a longer period of time. It simply was not feasible, but we did have the right voices at the table on the right days.
|
| Brooks Automation US, LLC | Guided Implementation | 10/10 | $13,700 | 10 | |
| Haworth | Guided Implementation | 10/10 | $137K | 80 |
Best: Matt is outstanding & patient in guiding us through the improvement and maturing process. We have picked up the pace and are starting to see ...
Best: Matt is outstanding & patient in guiding us through the improvement and maturing process. We have picked up the pace and are starting to see some real impact in this effort.
Worst: We are slow to implement changes... but picking up the pace.
|
| California Employment Development Department | Guided Implementation | 10/10 | $12,330 | 8 | |
| City of Allen, TX | Workshop | 10/10 | N/A | 32 |
We were able to easily adapt our thinking and processes and map those to the provided tools and discussion. That will make implementation of this ...
We were able to easily adapt our thinking and processes and map those to the provided tools and discussion. That will make implementation of this new PPM approach much more attainable.
|
| Public Safety Canada | Workshop | 9/10 | $50,000 | 23 |
Best parts were that Bill is super knowledgeable, patient and overall, just a nice person. He was able to quickly adapt to our culture and underst...
Best parts were that Bill is super knowledgeable, patient and overall, just a nice person. He was able to quickly adapt to our culture and understood the pressures we are facing.
Worst part was not having some fairly easily available data ready to go. We could have spent time massaging that info to be used ahead of the workshop.
|
| Ministry of Industry, Innovation, Science and Technology | Guided Implementation | 10/10 | $34,250 | 50 |
The best part is the valuable interactions around the tools and templates. The tools and templates alone without the guidance and support would hav...
The best part is the valuable interactions around the tools and templates. The tools and templates alone without the guidance and support would have caused us to take longer to achieve our goals.
|
| Oregon Military Department | Guided Implementation | 10/10 | $13,700 | 10 |
The whole package was useful and the time that was spent working through it together made it easy to adapt to our business needs.
The whole package was useful and the time that was spent working through it together made it easy to adapt to our business needs.
|
| Starkey Hearing Technologies | Workshop | 10/10 | $75,350 | 50 |
Bill is an exceptional facilitator and is a subject matter expert.
Bill is an exceptional facilitator and is a subject matter expert.
|
| Community Living Toronto | Workshop | 9/10 | $23,500 | 60 |
The sessions were very engaging and the team loved being pulled into various discussions. Doug did a great job poking around and challenging the s...
The sessions were very engaging and the team loved being pulled into various discussions. Doug did a great job poking around and challenging the status quo and offered suggestions/considerations for future plannings.
The sessions are quite long, and I felt like the team was maxed out around 2:00pm in the afternoon, but I understand the limitations, and we can power through this.
|
| State of Kansas Human Services | Workshop | 10/10 | $137K | 90 | |
| Kansas Department of Transportation | Workshop | 8/10 | $65,075 | 47 |
I really liked how Bill was able to get our executive staff engaged in the conversation. He did a great job of understanding our current state, an...
I really liked how Bill was able to get our executive staff engaged in the conversation. He did a great job of understanding our current state, and where we want/need to be.
Thinking back, we did a great job of looking at our end goal, but perhaps it would have been beneficial to spend more time defining our interim steps. Not just short/mid/long term goals, but something more like phases.
|
| New York State Technology Enterprise Corporation | Workshop | 10/10 | $685K | 120 |
Best: interaction and facilitation that Bill so expertly provided, ability to lead the group through the discussion to draw out the specific and a...
Best: interaction and facilitation that Bill so expertly provided, ability to lead the group through the discussion to draw out the specific and appropriate workflows for our business, identifying drivers and goals that were based on the workflow processes and tools to implement, and the actionable items to complete the PPM, Bill provided the much-needed training and context for explaining a rather challenging topic for us.
Worst: Although Bill managed this seamlessly for us, the some of the InfoTech materials are more IT department focused that are not as relatable to our business.
|
| Institute of Public Accountants | Guided Implementation | 9/10 | N/A | 2 |
Annabel is always extremely helpful she takes time to listen then helps work things through with me.
Annabel is always extremely helpful she takes time to listen then helps work things through with me.
|
| Harris County | Workshop | 10/10 | N/A | N/A |
The workshop delivery, deliverables, participation and discussion.
The workshop delivery, deliverables, participation and discussion.
|
ITRG Provides Proven Results for IT Leaders
30,000+
ITRG members spanning the Global 2000
$400M+
Cut from IT costs with our pricing intelligence and advisory support
+8%
Increase in stakeholder satisfaction where IT leaders used Info-Tech services
9.5/10
Member-related value across +50,000 analyst calls, workshops and projects
About Info-Tech Research Group
Info-Tech Research Group is the world’s fastest-growing information technology research and advisory company, proudly serving over 30,000 IT professionals.
We produce unbiased and highly relevant research to help CIOs and IT leaders make strategic, timely, and well-informed decisions. We partner closely with IT teams to provide everything they need, from actionable tools to analyst guidance, ensuring they deliver measurable results for their organizations.
Our Offices
Arlington, VA
1225 South Clark Street, Suite 1310
Arlington, VA, USA
22202
Las Vegas, NV
3960 Howard Hughes Parkway, Suite 500
Las Vegas, NV, USA
89169
London, ON
345 Ridout Street North
London, ON, Canada
N6A 2N8
London, UK
10 York Road, Suite 5W127
London, United Kingdom
SE1 7ND
Singapore
71 Robinson Road, #14-130
Singapore
068895
Sydney, NSW
320 Pitt Street, Level 6
Sydney, NSW, Australia
2000
Toronto, ON
888 Yonge Street
Toronto, ON, Canada
M4W 2J2