Develop a Master Data Management Practice and Platform
Are you sure you have a master data problem?
The Situation
- The volume of enterprise data is growing rapidly and comes from a wide variety of internal and external data sources (e.g. ERP, CRM). When data is located in different systems and applications, coupled with degradation and proliferation, this can lead to inaccurate, inconsistent, and redundant data being shared across departments within an organization.
- Data kept in separate sources can result in poor stakeholder decision making and inefficient business processes. Some common master data problems include:
- The lack of a clean customer list results in poor customer service.
- Hindering good analytics and business predictions, such as incorrect supply chain decisions when having duplicate product and vendor data between plants.
- Creating cross-group consolidated reports from inconsistent local data that require too much manual effort and resources.
This blueprint can help you:
- Build a list of business-aligned data initiatives and capabilities that address master data problem and realize business strategic objectives.
- Design a master data management practice based on the required business and data process.
- Design a master data management platform based on MDM implementation style and prioritized technical capabilities.
Blueprint Contents
-
Develop a Master Data Management Practice and Platform – Phases 1-2
-
Master Data Management Readiness Assessment Tool
-
Master Data Management Business Needs Assessment Tool
-
Master Data Management Business Case Presentation Template
-
Master Data Management Project Charter Template
-
Master Data Management Architecture Design Template
-
Master Data Management Practice Pattern Template
-
Master Data Management Platform Template
Member Testimonials
After each Info-Tech experience, we ask our members to quantify the real-time savings, monetary impact, and project improvements our research helped them achieve. See our top member experiences for this blueprint and what our clients have to say.
9.0/10
Overall Impact
$11,986
Average $ Saved
9
Average Days Saved
| Client | Ideal Industries, Inc. |
|---|---|
| Experience | Guided Implementation |
| Impact | 9/10 |
| $ Saved | $12,240 |
| Days Saved | 2 |
| Testimonial |
The ability to have a second review on a pending services contract before signature saved time and an estimated $7-10K in savings
The ability to have a second review on a pending services contract before signature saved time and an estimated $7-10K in savings
|
| Client | UN-World Intellectual Property Organization |
|---|---|
| Experience | Workshop |
| Impact | 9/10 |
| $ Saved | N/A |
| Days Saved | N/A |
| Testimonial |
The value delivered by the InfoTech workshop facilitator, Jean Bujold, goes far beyond what can be measured in time or dollar terms. His charisma a...
The value delivered by the InfoTech workshop facilitator, Jean Bujold, goes far beyond what can be measured in time or dollar terms. His charisma and presence made a lasting impact on the workshop participants, creating an engaging and insightful experience.
Jean demonstrated exceptional skill in engaging people and driving value through meaningful interaction. His facilitation helped set the right tone and manage expectations across the organization. I’ve also received very positive feedback from participants who found the session both informative and inspiring.
A heartfelt thank you to Jean and the entire team behind the scenes for making this workshop such a success!
|
| Client | Lindt & Sprungli (north America) Inc. |
|---|---|
| Experience | Guided Implementation |
| Impact | 9/10 |
| $ Saved | $19,720 |
| Days Saved | 20 |
| Testimonial |
| Client | Nozom Alkhebrat IT Co. |
|---|---|
| Experience | Guided Implementation |
| Impact | 9/10 |
| $ Saved | $4,000 |
| Days Saved | 5 |
| Testimonial |
| Client | Fernco Inc |
|---|---|
| Experience | Workshop |
| Impact | 10/10 |
| $ Saved | N/A |
| Days Saved | N/A |
| Testimonial |
Worse: Fernco is in the process of developing a Data Quality culture so to be able estimate time and dollar savings from MDM workshop is difficult ...
Worse: Fernco is in the process of developing a Data Quality culture so to be able estimate time and dollar savings from MDM workshop is difficult at this time.
Best: The outputs from the MDM workshop helps to lay the foundation with Data Stewards and provides essential information for engaging the support from Fernco Data Owners to continue building a data quality culture
|
| Client | Circular Materials |
|---|---|
| Experience | Workshop |
| Impact | 10/10 |
| $ Saved | $25,000 |
| Days Saved | 10 |
| Testimonial |
Appreciated the hands-on modelling work with Reddy and Dirk. We will be walking away from the workshop with a good foundation of models that captu...
Appreciated the hands-on modelling work with Reddy and Dirk. We will be walking away from the workshop with a good foundation of models that capture the collective knowledge of key team members.
Reddy and Dirk adapted will to delivering the session remotely. I think the experience would have been even better onsite without the distractions of being accessible because of participants being on laptops.
|
| Client | Fusion Superplex |
|---|---|
| Experience | Guided Implementation |
| Impact | 8/10 |
| $ Saved | $25,000 |
| Days Saved | 50 |
| Testimonial |
| Client | WernerCo. |
|---|---|
| Experience | Guided Implementation |
| Impact | 8/10 |
| $ Saved | $68,000 |
| Days Saved | 10 |
| Testimonial |
I love the thought leadership.
I wish master data was easy.
I love the thought leadership.
I wish master data was easy.
|
| Client | Northern Ontario School of Medicine |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | N/A |
| Days Saved | 120 |
| Testimonial |
Everyone went smoothly, everything was great. Not 'worst' parts to report thus far.
Everyone went smoothly, everything was great. Not 'worst' parts to report thus far.
|
| Client | Cengage Learning |
|---|---|
| Experience | Guided Implementation |
| Impact | 8/10 |
| $ Saved | N/A |
| Days Saved | 50 |
| Testimonial |
| Client | Fisheries and Oceans Canada |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $25,000 |
| Days Saved | 50 |
| Testimonial |
Igor was very knowledgeable, delivered relevant materials synthesized from the Info-Tech website resources, and has offered access to other relevan...
Igor was very knowledgeable, delivered relevant materials synthesized from the Info-Tech website resources, and has offered access to other relevant supporting materials to support our planned mater data management work.
|
| Client | Blommer Chocolate Company |
|---|---|
| Experience | Guided Implementation |
| Impact | 8/10 |
| $ Saved | $13,600 |
| Days Saved | 10 |
| Testimonial |
Provided practical thoughts on how to get started.
Provided practical thoughts on how to get started.
|
| Client | Amedisys Holding, LLC |
|---|---|
| Experience | Guided Implementation |
| Impact | 1/10 |
| $ Saved | N/A |
| Days Saved | N/A |
| Testimonial |
Both teams were both completely unprepared for the call.
Both teams were both completely unprepared for the call.
|
| Client | CF Industries Enterprises Inc |
|---|---|
| Experience | Guided Implementation |
| Impact | 8/10 |
| $ Saved | $2,584 |
| Days Saved | 2 |
| Testimonial |
| Client | AAA Club Alliance Inc. |
|---|---|
| Experience | Guided Implementation |
| Impact | 9/10 |
| $ Saved | N/A |
| Days Saved | N/A |
| Testimonial |
Igor is very knowledgeable about this area and the challenges companies face in moving forward implementing MDM. Lots of good ideas!
Igor is very knowledgeable about this area and the challenges companies face in moving forward implementing MDM. Lots of good ideas!
|
| Client | North Country HealthCare |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | $34,000 |
| Days Saved | 120 |
| Testimonial |
| Client | Unified Health Services |
|---|---|
| Experience | Guided Implementation |
| Impact | 10/10 |
| $ Saved | N/A |
| Days Saved | 20 |
| Testimonial |
All great. Very helpful. This info will help us jumpstart our data architecture efforts.
All great. Very helpful. This info will help us jumpstart our data architecture efforts.
|
| Client | Experience | Impact | $ Saved | Days Saved | Testimonial |
|---|---|---|---|---|---|
| Ideal Industries, Inc. | Guided Implementation | 9/10 | $12,240 | 2 |
The ability to have a second review on a pending services contract before signature saved time and an estimated $7-10K in savings
The ability to have a second review on a pending services contract before signature saved time and an estimated $7-10K in savings
|
| UN-World Intellectual Property Organization | Workshop | 9/10 | N/A | N/A |
The value delivered by the InfoTech workshop facilitator, Jean Bujold, goes far beyond what can be measured in time or dollar terms. His charisma a...
The value delivered by the InfoTech workshop facilitator, Jean Bujold, goes far beyond what can be measured in time or dollar terms. His charisma and presence made a lasting impact on the workshop participants, creating an engaging and insightful experience.
Jean demonstrated exceptional skill in engaging people and driving value through meaningful interaction. His facilitation helped set the right tone and manage expectations across the organization. I’ve also received very positive feedback from participants who found the session both informative and inspiring.
A heartfelt thank you to Jean and the entire team behind the scenes for making this workshop such a success!
|
| Lindt & Sprungli (north America) Inc. | Guided Implementation | 9/10 | $19,720 | 20 | |
| Nozom Alkhebrat IT Co. | Guided Implementation | 9/10 | $4,000 | 5 | |
| Fernco Inc | Workshop | 10/10 | N/A | N/A |
Worse: Fernco is in the process of developing a Data Quality culture so to be able estimate time and dollar savings from MDM workshop is difficult ...
Worse: Fernco is in the process of developing a Data Quality culture so to be able estimate time and dollar savings from MDM workshop is difficult at this time.
Best: The outputs from the MDM workshop helps to lay the foundation with Data Stewards and provides essential information for engaging the support from Fernco Data Owners to continue building a data quality culture
|
| Circular Materials | Workshop | 10/10 | $25,000 | 10 |
Appreciated the hands-on modelling work with Reddy and Dirk. We will be walking away from the workshop with a good foundation of models that captu...
Appreciated the hands-on modelling work with Reddy and Dirk. We will be walking away from the workshop with a good foundation of models that capture the collective knowledge of key team members.
Reddy and Dirk adapted will to delivering the session remotely. I think the experience would have been even better onsite without the distractions of being accessible because of participants being on laptops.
|
| Fusion Superplex | Guided Implementation | 8/10 | $25,000 | 50 | |
| WernerCo. | Guided Implementation | 8/10 | $68,000 | 10 |
I love the thought leadership.
I wish master data was easy.
I love the thought leadership.
I wish master data was easy.
|
| Northern Ontario School of Medicine | Guided Implementation | 10/10 | N/A | 120 |
Everyone went smoothly, everything was great. Not 'worst' parts to report thus far.
Everyone went smoothly, everything was great. Not 'worst' parts to report thus far.
|
| Cengage Learning | Guided Implementation | 8/10 | N/A | 50 | |
| Fisheries and Oceans Canada | Guided Implementation | 10/10 | $25,000 | 50 |
Igor was very knowledgeable, delivered relevant materials synthesized from the Info-Tech website resources, and has offered access to other relevan...
Igor was very knowledgeable, delivered relevant materials synthesized from the Info-Tech website resources, and has offered access to other relevant supporting materials to support our planned mater data management work.
|
| Blommer Chocolate Company | Guided Implementation | 8/10 | $13,600 | 10 |
Provided practical thoughts on how to get started.
Provided practical thoughts on how to get started.
|
| Amedisys Holding, LLC | Guided Implementation | 1/10 | N/A | N/A |
Both teams were both completely unprepared for the call.
Both teams were both completely unprepared for the call.
|
| CF Industries Enterprises Inc | Guided Implementation | 8/10 | $2,584 | 2 | |
| AAA Club Alliance Inc. | Guided Implementation | 9/10 | N/A | N/A |
Igor is very knowledgeable about this area and the challenges companies face in moving forward implementing MDM. Lots of good ideas!
Igor is very knowledgeable about this area and the challenges companies face in moving forward implementing MDM. Lots of good ideas!
|
| North Country HealthCare | Guided Implementation | 10/10 | $34,000 | 120 | |
| Unified Health Services | Guided Implementation | 10/10 | N/A | 20 |
All great. Very helpful. This info will help us jumpstart our data architecture efforts.
All great. Very helpful. This info will help us jumpstart our data architecture efforts.
|
ITRG Provides Proven Results for IT Leaders
30,000+
ITRG members spanning the Global 2000
$400M+
Cut from IT costs with our pricing intelligence and advisory support
+8%
Increase in stakeholder satisfaction where IT leaders used Info-Tech services
9.5/10
Member-related value across +50,000 analyst calls, workshops and projects
About Info-Tech Research Group
Info-Tech Research Group is the world’s fastest-growing information technology research and advisory company, proudly serving over 30,000 IT professionals.
We produce unbiased and highly relevant research to help CIOs and IT leaders make strategic, timely, and well-informed decisions. We partner closely with IT teams to provide everything they need, from actionable tools to analyst guidance, ensuring they deliver measurable results for their organizations.
Our Offices
Arlington, VA
901 N Glebe Rd, Suite 05-145
Arlington, VA, USA
22203
Las Vegas, NV
3960 Howard Hughes Parkway, Suite 500
Las Vegas, NV, USA
89169
London, ON
345 Ridout Street North
London, ON, Canada
N6A 2N8
London, UK
10 York Road, Suite 5W127
London, United Kingdom
SE1 7ND
Singapore
71 Robinson Road, #14-130
Singapore, Singapore
068895
Sydney, NSW
320 Pitt Street, Level 6
Sydney, NSW, Australia
2000
Toronto, ON
888 Yonge Street
Toronto, ON, Canada
M4W 2J2