RETIRED CONTENT

Please note that the content on this page is retired. This content is not maintained and may contain information or links that are out of date.

Small enterprises relocating IT assets will want to verify that necessary network cabling work has been completed before the move. Ensure that the following segments of the network cabling meet enterprise needs:

  • Cable runs conform to distance limitations.
  • Conduit installations account for future expansion.
  • Network infrastructure tests successfully.

This tool will aid the IT leader in identifying, recording, and tracking needed network cabling work prior to the IT relocation.

 

This downloadable tool is associated with the research note, "IT Relocation: Planned Network Cabling Reduces Downtime."

Related Content

Hide Details

Search Code: 8867
Published: February 14, 2007
Last Revised: February 14, 2007

Social

Get Access

Get Instant Access
To unlock the full content, please fill out our simple form and receive instant access.