Including both current and future facility requirements helps to align costs and capacity with enterprise needs. Calculate power, cooling, and standby power requirements...
|
14
|
Many IT departments lack internal expertise to undertake a data center build project as facilities require specific industrial design and engineering requirements to meet...
|
8
|
A data center build project charter is essential to the planning phase of the project. It lays out important information such as the project's description, potential...
|
16
|
In complex, multi-vendor data center environments, a contract management policy is an essential control tool used to minimize the risk and maximize the benefits of vendor...
|
11
|
One of the most important phases a new data center build is selecting the building site. Whether it is an existing building or a new construction site, IT must exercise...
|
9
|
Virtual Desktop Infrastructure (VDI) can be an effective solution for managing end client assets and the client experience. Just like any other solution, VDI must also...
|
6
|
Organizations that have determined a shortlist of co-location vendors (likely after the RFP process) should conduct additional due diligence before making the final...
|
7
|
When building or refreshing the data center, IT must have a high level understanding of requirements and potential budget. Facility requirements for power, cooling,...
|
10
|
Planning for the physical layout and design of the data center building space should include more than just the equipment room. For example, areas for loading equipment,...
|
8
|
Flywheel technology is emerging in the market as a strong alternative to UPS battery-based ride-through systems in the data center. Active Power presents a leading...
|
7
|