The data center must be equipped with fire detection and suppression systems to identify and extinguish fire, abide by local, state and federal laws, codes and standards,...
|
|
Planning for the physical layout and design of the data center building space should include more than just the equipment room. For example, areas for loading equipment,...
|
|
Establishing operations at the recovery site is only the first half of the work involved in disaster recovery. At some point, services and systems must be returned to...
|
|
Whether it is an existing building or a new construction site, IT must cover due diligence by completing a site evaluation for each potential location. Use a building...
|
|
Many IT departments lack internal expertise to undertake a data center build project as facilities require specific industrial design and engineering requirements to meet...
|
|
A data center relocation can be best described as a controlled disaster that involves high risk and requires rigorous and thorough planning. Over 29% of IT professionals...
|
|
Organizations engaged in a backup architecture redesign must align their architecture with business properties and requirements to minimize costs, while ensuring adequate...
|
|
The iPad 2 doesn't have any revolutionary new business features, but its cameras, in addition to increased comfort and speed, provide an incremental benefit to the...
|
|
Use flowcharts and checklists to create effective SOP documents.
|
|
Use this template to record the key details required for effective problem management – both proactive and reactive. Outline a problem management workflow, record the...
|
|