WLAN Build or Refresh Implementation Plan Template for Small Governments

Author(s): Margaret Hao, Cassandra Cooper

1 Download

Get Instant Access
To unlock the full content, please fill out our simple form and receive instant access.

Break down the entire WLAN build or refresh process into a series of logical, sequential steps.

  • Develop the network design.
  • Plan and account for network downtime.
  • Perform network testing procedures.
  • Lead staff through role changes and perform role transitions.
  • Perform role assessment and determine training requirements.
  • Build the implementation timeline and task matrix.

Following the completion of these steps, the initial WLAN build or refresh will have been executed.

Related Content

Visit our IT Cost Optimization Center
Over 100 analysts waiting to take your call right now: 1-519-432-3550 x2019